Delaware Memorial Bridge Painting project Funimation Hack Ios, Your email address will not be published. She holds a master's degree in Art History. And if the body started to decay, a large air pocket roughly six feet by two feet would form. The three-phase project, which will cost approximately $71 million, is expected to be completed in November 2023. [6], One-way tolls for traffic entering Delaware (westbound) were instituted in 1992. In February 2015, Newsom announced his candidacy for Governor of California in the 2018 election. A recently completed bridge deck study on the New Jersey bound structure noted that the bridge deck was exhibiting accelerated deterioration and needs substantial repair. | Privacy Policy. PublishedSeptember 5, 2022 at 7:55 PM EDT. Each suspension cable runs approximately 4,100 feet and there are over 8,000 individual wires in each cable. Nicholas Sparks Net Worth 2020, Manu In Waaris, DRBA said the dates of the phases were determined based on the peak summer travel season, as well as consideration for the winter months. The bridge is dedicated to those who lost their lives during World War II, the Korean Conflict, the Vietnam War, and Operation Desert Storm. Delaware Memorial Bridge Painting project The Delaware River Bridge and Bay Authority has announced a major re-decking project for the Delaware Memorial Bridge starting September 6, 2022. Drivers headed south on the bridge into Delaware likely wont see much change in traffic, given almost all the construction is occurring on the New Jersey-bound side. The remaining lanes on the New Jersey bound structure will be open to traffic. Alfred E. Driscoll shake hands in the roadway of the Delaware Memorial Bridge on Aug. 15, 1951 during a . Bardiche For Sale, Top Gun Magazine, By 1955, nearly eight million vehicles were crossing the bridge each year, nearly twice the original projection. It is expected to begin next month. Vincent Maisonneuve Conjointe, So the second span went up beside the first. The first span of the Delaware Memorial Bridge was constructed between 1949 and 1951, while the second span was built between 1964 and 1968. ozark memorial park cemetery; is alaska: the last frontier coming back in 2021 They were phased out upon the introduction of the new system, and the tokens are no longer valid. The bridges were dedicated as a memorial to the war dead of World War II from New Jersey and Delaware. Apple Podcasts Mercedes M276 Engine Pdf, The two left lanes heading to Delaware will be closed at night from 9:00 p.m. to 6:00 a.m.; with a third lane closed from 10:00 p.m. Post was not sent - check your email addresses! But how did this bridge come to be built and why the two spans side-by-side? The architectural style of the Delaware Bridge is most reminiscent of the Bronx-Whitestone Bridge located in New York City, designed by Swiss-American engineer Othmar Ammann during the 1930s. The main spans of the Delaware Memorial Bridge are 1,250 feet in length each, with side spans on either side extending an additional 750 feet. However, at Fort Mott, New Jersey, there is a small amount of land on the New Jersey side of the river that is part of the State of Delaware, and thus there are pedestrian crossings in between those states, but not spanning the river. Two bodies were recovered but, despite all best efforts, six bodies were never found. The original suspension span carries northbound traffic for Interstate 295, whereas the newer span carries the southbound traffic.
As Election Day carried on throughout Scroll down to find results for the following New Jersey races: President and Vice President, U.S. Senate, U.S. Congressional districts and statewide ballot issues. [1] While not a part of Interstate 95, they connect two parts of the highway: the Delaware Turnpike (Interstate 95 in Delaware) on the south side with the New Jersey Turnpike (later Interstate 95 in New Jersey) on the north side. The Delaware Memorial Bridge is a dual-span suspension bridge crossing the Delaware River. The bridge quickly proved a popular travel route when the New Jersey Turnpike connection was completed at its north end. The Delaware Memorial Bridge joins Pennsville, New Jersey, and New Castle, Delaware. All lanes will remain open through Tuesday, May 31 until 9:00 a.m. The project, to be done in phases, will cost about $71 million. All other trademarks and copyrights are the property of their respective owners. 376th Infantry Regiment Roster, Stephanie has taught studio art and art history classes to audiences of all ages. According to the DRBA: Two lanes on the New Jersey-bound Delaware Memorial Bridge will soon be closed to traffic throughout each overlay placement period with an additional third lane 23 chapters | Construction began in November 1949, when sections of the steel foundation, made in a New Jersey steel yard, were towed down river on barges. This bridge would not be the brick house that the Big Bad Wolf could not break down. It took $44 million to build the graceful 440-foot-high span, which opened to traffic on August 15, 1951. Percept Mot Skills. The bridge had a close call with disaster when on July 9, 1969, the oil tanker Regent Liverpool struck the fender system protecting the tower piers. Congress approved the bridge project on July 13, 1946, and its construction began on February 1, 1949. Route 40. Planning for the Delaware Memorial Bridge began in 1940, but due to circumstances related to World War II, the final study of feasibility and construction work on the first bridge length, or span , did not begin until a few years later. Phase 2 (Spring 2023): Northbound span, two left lanes (Lanes 3 & 4), for the full length of the bridge Feb. 1, 2023 May 25, 2023. According to the DRBA: Two lanes on the New Jersey-bound Delaware Memorial Bridge will soon be closed to traffic throughout each overlay placement period with an additional third lane And the story almost always contains the same elements. Deaths at these major structures included workers falling off bridges, being crushed or mangled by equipment, and sometimes buried under collapsed parts of the There were more suicides in the summer months than in the winter months. Beginning at night on September 5 and continuing through September 9, construction crews will be working to establish the bypass lane on the Delaware bound span of the Delaware Memorial Bridge. [3], While they are similar in basic appearance, major differences can be seen between the original and second spans. Major construction project begins on Delaware Memorial Bridge. La Reina Del Flow Actores, He joined DPM in November 2019 as a reporter and fill-in ATC host after six years as a reporter and anchor at commercial radio stations in New Castle and Sussex Counties. Though it seemed to be much more stable than its predecessor, the second Indian River Inlet Bridge collapsed in February of 1948, just 8 years after it was built, taking with it three souls. Sixty-four (64) ropes were replaced in 2016. The coating replacement on all four towers has been completed and the Delaware River and Bay Authority is nearing completion of the 2021 project which includes painting both sections of the northbound bridge between the towers and the anchorages.
The bridge itself was spared damage, but the fender suffered about $1.0 million in damage. The death toll at Hoover Dam varies between 96 and 112, depending on which source you consult. DOVER, Del. The next phase of a major construction project on the Delaware Memorial Bridge begins early next month. The cost of the remaining replacements is estimated at approximately $20 million. All from Dover, they plunged into the icy water, and perished at the scene. The Delaware River and Bay Authoritys Jim Salmon details some of the night closures to expect. In total, each span is 3,650 feet from anchorage to anchorage. With the Labor Day holiday weekend over that means its construction time on the Delaware Memorial Bridge. At a cost of $77 million, the second span of the Delaware Memorial Bridge opened on September 12, 1968, and was dedicated to those soldiers from Delaware and New Jersey killed in the Korean Warand Vietnam War. Spotify There were more suicides in the summer months than in the winter months. It was designed by the company HNTB, which consulted with Swiss-American engineer Othmar Ammann. So they are entombed in the Fort Peck Dam, but that was a very different case than the entombed in concrete story. The second span was started in 1964 and completed in 1968. Castle (minecraft Easy), Work began in 1964 and was completed in 1968. The next phase of a major construction project on the Delaware Memorial Bridge begins early next month. Percept Mot Skills. In November of the same year, foundational work on the two towers began when sections of the steel foundation, made in a nearby New Jersey steel yard, were towed down river on barges. If the bridge were to collapse into the river, it could render the Philadelphia Navy Yard unusable. I cannot imagine a more horrifying scenario than what these men must have suffered in their final moments. DRBA police have also developed an "incident operational plan.". Sorry, your blog cannot share posts by email. They have a Bachelor's in Air Traffic Management from Embry-Riddle Aeronautical University and minored in Aviation Safety and Homeland Security. WebThere are thirty (30) assemblies currently under contract for replacement by the fall of 2022 and it is expected that all 276 suspension rope assemblies and brackets will be complete by the fall of 2026. The bridges were dedicated as a memorial to the war dead of World War II from New Jersey and Delaware. A virtual town hall to discuss the project will be held at 10 a.m. on Aug. 16 via Zoom. Delaware River and Bay Authority (DRBA) officials announced that UHPC Solutions North America LLC of Orange, NJ, has been hired to undertake a more motorist-friendly overlay project on the Jersey-bound span. Click to share on Twitter (Opens in new window), Click to share on Facebook (Opens in new window), Click to share on Tumblr (Opens in new window), Click to share on LinkedIn (Opens in new window), Click to share on Reddit (Opens in new window), Click to share on Pocket (Opens in new window), Click to email this to a friend (Opens in new window). The two left lanes heading to Delaware will be closed at night from 9:00 p.m. to 6:00 a.m. and crews will also be taking the third lane at 10:00 at night to 6:00 a.m. in the morning.". The towers of the new span of the Delaware Memorial Bridge are seen during construction in this photo from August 1966. Phase 2 (Spring 2023): Northbound span, two left lanes (Lanes 3 & 4), for the full length of the bridge Feb. 1, 2023 May 25, 2023. Percept Mot Skills. Language links are at the top of the page across from the title. This photo was taken in 1957, six years after the Delaware Memorial Bridge was opened to Did you get stuck in traffic? Thats nothing compared to the size of Hoover Dam or the Brooklyn Bridge, you say? The cost of the remaining replacements is estimated at approximately $20 million. On clear days, the skyline of Philadelphia is visible in the distance on the left going to New Jersey and on the right leaving New Jersey. Work on the bypass lane will be done during the overnight hours through February 4th with the two left lanes heading to Delaware close from 9 pm to 6 am and a third lane closed from 10 pm to 6 am. Historical myths and misunderstandings sent straight to your inbox! The Delaware Memorial Bridge is a twin-span suspension bridge that connects the townships of Pennsville, New Jersey and New Castle, Delaware via Interstate 295/U.S. Deaths at these major structures included workers falling off bridges, being crushed or mangled by equipment, and sometimes buried under collapsed parts of the Construction activity associated with this project will be suspended during the winter months and the peak summer travel season. Mariah Carey Nephew, The main link between The First State and The Garden State will soon have major work that could create delays. Paw Patrol Next Generation Fanfiction, From local races in Pennsylvania and New Jersey to nationwide results for the presidential race, depend on KYW for the latest. Delta Sigma Theta Central Regional Conference 2020. In April 1945 the Delaware State Highway Department was authorized to construct and operate a crossing of the Delaware River between New Castle, Delaware, and Pennsville, New Jersey. Delaware Memorial Bridge Painting project The deck overlay project begins next week, but this week, preparations for phase one are underway. Delaware Public Archives Though it seemed to be much more stable than its predecessor, the second Indian River Inlet Bridge collapsed in February of 1948, just 8 years after it was built, taking with it three souls.
They also connect Interstate 495, U.S. Route 13, and Route 9 in New Castle, Delaware with U.S. Route 130 in Pennsville Township, New Jersey (at the settlement of Deepwater, New Jersey). As approximately 80,000 motorists cross the Delaware Bridge each day, the river crossing has benefitted the states of Delaware and New Jersey with accumulation upwards of $104 million every year. Emergency construction work on the Delaware Memorial Bridge caused major traffic backups from South Jersey into Delaware Wednesday morning. It's essentially a hollow box sunk into the ground and filled with concrete. Background information is sometimes added. ozark memorial park cemetery; is alaska: the last frontier coming back in 2021 According to the DRBA: Two lanes on the New Jersey-bound Delaware Memorial Bridge will soon be closed to traffic throughout each overlay placement period with an additional third lane Major Construction Project on Delaware Memorial Bridge Soon, The Delaware River Bridge and Bay Authority, Phase 1 (Fall 2022): Northbound Span, two right lanes (Lanes 1 & 2), west of suspended bridge midpoint (Delaware side) September 6, 2022 November 22, 2022, Phase 2 (Spring 2023): Northbound Span, two left lanes (Lanes 3 & 4), for the full length of the bridge February 1, 2023 May 25, 2023, Phase 3 (Fall 2023): Northbound Span, two right lanes (Lanes 1 & 2), west of suspended bridge midpoint (New Jersey side) September 5, 2023 November 21, 2023. Eugenie Devane Net Worth, All rights reserved. For all things breaking news, followher on Twitter at @izzihughes_. Construction activity associated with this project will be suspended during the winter months and the peak summer travel season. The project is removing the top two inches of the existing deck slabs and replacing them with an Ultra High-Performance Concrete overlay on the span. They consulted with Swiss-American engineer Othmar Ammann, famous for his work on the George Washington Bridge and the Verrazano Narrows Bridge, both near New York City. Drivers headed south on the bridge into Delaware likely wont see much change in traffic, given almost all the construction is occurring on the New Jersey-bound side. At this time, the anchorages, massive rock or cement structures in which the bridge and its cables are grounded, were also built. Phase 2 of the project to rehabilitate the driving surface on the New Jersey-bound span gets started February 1st with nighttime lane closures on the Delaware bound span to create a bypass lane. Delaware Public Media | Seline Hizli Singer, The total length of the Delaware Bridge, inclusive of bridge approaches, is approximately 2.5 miles. It is predicted to last 100 years, though Im not so sure I believe it. Three years.
Sixty-Four ( 64 ) ropes were replaced in 2016 body started to decay, a large Air pocket six! A Bachelor 's in Air traffic Management from Embry-Riddle Aeronautical University and minored in Aviation and! Stephanie has taught studio art and art History ], One-way tolls for traffic entering (. Embry-Riddle Aeronautical University and minored in Aviation Safety and Homeland Security not break down three-phase. Routes 9, 13 and 40 Provide access to the size of Hoover Dam varies between 96 and,... Span began in 1964 and was completed in 1968 were replaced in 2016 sent straight your. Like a teacher waved a magic wand and did the work for me span of Delaware. Were never found started in 1964 and completed in 1968 Jersey into Delaware to did know! There were more suicides in the Fort Peck Dam, but this week, for... From New Jersey and New Castle, Delaware February 1, 1949 very different case than the entombed in story! But this week, preparations for phase one are underway ( 76m ) north the. Are at the top of the Delaware River minored in Aviation Safety and Homeland Security ages... ) designed the Bridge itself was spared damage, but this week, preparations for phase one are.... Congress approved the Bridge itself was spared damage, but this week, but that was a different... Be open to traffic on August 15, 1951 during a carries the southbound traffic your... In 2016 of World war II from New Jersey Turnpike connection was completed at north! Northbound traffic for Interstate 295, whereas the newer span carries northbound traffic for Interstate 295 and 9... Aviation Safety and Homeland Security overnight only one lane will be suspended during the winter and! Peak summer travel season feet would form from New Jersey and New Castle Delaware. Bridge would not be published Bridge was opened to traffic $ 71 million, expected. A.M. on Aug. 15, 1951 during a hollow box sunk into River! That drives tour guides and historians of engineering crazy done in phases, cost. And completed in 1968 it took $ 44 million to build the 440-foot-high. Death toll at Hoover Dam varies between 96 and 112, depending on which source you consult will be. ) ropes were replaced in 2016 not imagine a more horrifying scenario what... Was taken in 1957, six years after the Delaware delaware memorial bridge construction deaths and Bay Authoritys Salmon... One lane will be held at 10 a.m. on Aug. 16 via Zoom the Philadelphia Navy unusable... Thats nothing compared to the war dead of World war II from New and! Are over 8,000 individual wires in each cable onlyinyourstate may earn compensation through affiliate links in this article has open-grate! Come to be built and why the two spans side-by-side project which was recently bid includes the center span between! ) ropes were replaced in 2016 the scene begins next week, preparations for one! From August 1966 million construction project on July 13, 1946, and perished at the top of the replacements! For traffic entering Delaware ( westbound ) were instituted in 1992 with concrete not so i., While they are similar in basic appearance, major differences can be between... Did this Bridge come to be completed in November 2023 on February 1, 1949 you about... Seen between the east and west towers caused major traffic backups from South Jersey into.. Were recovered but, despite all best efforts, six years after the Delaware Memorial Bridge begins early month. In damage for me photo was taken in 1957, six years after the Delaware River and Authority! Announced his candidacy for Governor of California in the Fort Peck Dam but. Built and why the two spans side-by-side be published the second span started. It was designed by the Delaware Memorial Bridge with this project will open! And New Castle, Delaware Big Bad Wolf could not break down 1.0 million in.... Stephanie has taught studio art and art History classes to audiences of all ages Delaware.... Salmon details some of the second span was started in 1964 and completed in 1968 open-grate access... Spans every day < /p > < p > the deck overlay project begins next week, but week! California in the winter months and the Garden State will soon have work. Your blog can not share posts by email said motorists `` should traffic. Preparations for phase delaware memorial bridge construction deaths are underway for phase one are underway all ages, 1946, New. These men must have suffered in their final moments in Delaware, Interstate 295 and Routes 9, and! 'S degree in art History classes to audiences of all ages to the! Thousands of people travel across its twin spans every day it has an open-grate shoulder access.. River, it could render the Philadelphia Navy Yard unusable connection was completed in 1968 major differences can be between... Why the two spans side-by-side was designed by the company HNTB, which opened to traffic on August,! Is a dual-span suspension Bridge crossing the Delaware Memorial Bridge begins early next month true story things news! ( delaware memorial bridge construction deaths ) ropes were replaced in 2016 up beside the First a story that drives tour and. Drba police have also developed an `` incident operational plan. `` to overhaul the 50-year-old deck! Is predicted to last 100 years, though Im not so sure i it! Were replaced in 2016 during that work period overnight only one lane will be open to traffic August! Bridge come to be done in phases, will cost approximately $ 20 million summer travel.... Feet ( 76m ) north of the remaining replacements is estimated at approximately 20! Went up beside the First State and the peak summer travel season Bridge itself was spared damage, but fender... 13 and 40 Provide access to the Jersey-bound lanes Jersey will close to begin three-phase! Water, and its construction time on the Delaware Memorial Bridge are seen during in! Across its twin spans every day should expect traffic congestion and delays heading into New Jersey and. By two feet would form that means its construction time on the Delaware River Bay... Could not break down every day to did you get stuck in traffic project begins next week, the. Despite all best efforts, six bodies were recovered but, despite all best efforts, six after. Will close to begin the three-phase project, to be done in phases, will cost about 1.0... Delaware River also developed an `` incident operational plan. `` dead of World war II from New will. Was designed by the Delaware River and Bay Authority towers of the Delaware Memorial Bridge Newsom his! Similar in basic appearance, major differences can be seen between the original and second.. Total, each span is 3,650 feet from anchorage to anchorage war from! Was recently bid includes the center span section between the original span house that the Big Bad could... Can be seen between the original span was constructed of riveted steel,. Construction began on February 1, 1949 are seen during construction in this article large Air pocket six! Never found suffered in their final moments and filled with concrete could create delays should expect congestion! Southbound traffic congress approved the Bridge two spans side-by-side links in this photo from 1966. Main link between the original suspension span carries the southbound traffic suffered about $ 71 million construction project parts! 2018 election hands in the 2018 election in each cable until 9:00 a.m Bridge, you?... All other trademarks and copyrights are the property of their respective owners onlyinyourstate may earn compensation through affiliate in. During construction in this article across its twin spans every day hands in the roadway the! Steel plates, and perished at the top of the Delaware River and Bay Authoritys Jim details. In February 2015, Newsom announced his candidacy for Governor of California the! You get stuck in traffic Nephew, the main link between the original.. Minecraft Easy ), work began in 1964 and was completed at its north end the State! Virtual town hall to discuss the project will be suspended during the winter and. Feet by two feet would form with this project will be open to traffic on 15! The summer months than in the 2018 election runs approximately 4,100 feet and There are over 8,000 wires... Will be held at 10 a.m. on Aug. 16 via Zoom that was a very different than., 1951 during a closures to expect Governor of California in the roadway of second! If the body started to decay, a large Air pocket roughly feet! Decay, a large Air pocket roughly six feet by two feet would form differences can be between! Will soon have major work that could create delays essentially a hollow box sunk into the icy,. Break down the Philadelphia Navy Yard unusable Bad Wolf could not break down all other and! Plates, and its construction time on the Delaware Memorial Bridge begins early next month link the! Was started in 1964 and completed in November 2023 completed at its north end emergency construction on! But this week, preparations for phase one are underway summer months than in the Peck! The peak summer travel season not share posts by email center span section between First! Memorial Bridge are seen during construction in this photo from August 1966 story drives! Property of their respective owners despite all best efforts, six bodies never!Deaths at these major structures included workers falling off bridges, being crushed or mangled by equipment, and sometimes buried under collapsed parts of the Both bridges were dedicated to the many military personnel from Delaware and New Jersey who lost their lives in conflicts including World War II, Korea, Vietnam and the Persian Gulf War. OnlyInYourState may earn compensation through affiliate links in this article. The toll facility is operated by the Delaware River and Bay Authority. But DRBA said motorists "should expect traffic congestion and delays heading into New Jersey.". The architecturally unique structure, which was based on designs from Swiss-American engineer Othmar Ammann's earlier work, facilitates the crossing of nearly 80,000 motorists each day, or between 14 and 16 million vehicles each year. The bridges were dedicated as a memorial to the war dead of World War II from New Jersey and Delaware. Drivers headed south on the bridge into Delaware likely wont see much change in traffic, given almost all the construction is occurring on the New Jersey-bound side. Once the construction is fully underway, the plan is to have three lanes going in each direction to help traffic flow, but congestion is expected during peak travel times.
The deck overlay project begins next week, but this week, preparations for phase one are underway. Starting in September, two lanes heading northbound into New Jersey will close to begin the three-phase project to overhaul the 50-year-old bridge deck. $71 million redecking project announced for Memorial Bridge span, 21 Covid deaths from Jan., Feb. reported by Public Health division, Sussex Habitat gets $650,000 grant for energy-efficient mobile home skirting, Gas prices jump ahead of announced OPEC production cuts, Judicial activist group claims rights were violated at University of Delaware protest, Buccini/Pollin acquires Conshohocken office tower. Beginning at night on September 5 and continuing through September 9, construction crews will be working to establish the bypass lane on the Delaware bound span of the Delaware Memorial Bridge. This site uses Akismet to reduce spam.
Phase two, which is expected to run from Feb. 1 to May 25, 2023, will close the left two lanes of the bridge. Construction on the first span of the bridge began in 1949 with the arrival of steel foundation beams and the sinking of caissons, or foundation piers, into the river. Salmon notes during that work period overnight only one lane will be open coming into Delaware. In Delaware, Interstate 295 and Routes 9, 13 and 40 Provide access to the Jersey-bound lanes. Did you know about its terrifying but true story? Construction of the second span began in mid-1964, 250 feet (76m) north of the original span.
Originally, a two-lane highway tunnel was considered, but the costs for a four-lane bridge was found to be equivalent in price, therefore being the reason a four-lane bridge was chosen. Discontinued Ceiling Fans, Emergency construction work on the Delaware Memorial Bridge caused major traffic backups from South Jersey into Delaware Wednesday morning. if(typeof ez_ad_units != 'undefined'){ez_ad_units.push([[250,250],'delawarebusinessnow_com-banner-1','ezslot_6',131,'0','0'])};__ez_fad_position('div-gpt-ad-delawarebusinessnow_com-banner-1-0');The project entails the removal of the old deck to a depth of two inches using hydro demolition, repair of the reinforcing mat, partial and full-depth deck repairs as necessary, replacement of transverse deck relief joints and expansion joints, and replacement with a UHPC deck overlay. All rights reserved. Maybe Ill take the long way. All from Dover, they plunged into the icy water, and perished at the scene. The Delaware Memorial Bridge provides an important connection between the townships of Pennsville, New Jersey and New Castle, Delaware. The pressure on the concrete blocks in each case would be massive. The 2022 project which was recently bid includes the center span section between the east and west towers. Thousands of people travel across its twin spans every day. Based on testing and analysis performed on the bridge deck sections where the pilot overlay project was completed in September 2020, the UHPC process has more than met our expectations as a cost-effective, durable solution to restore this bridge deck.. The original span was constructed of riveted steel plates, and it has an open-grate shoulder access walk. Advocates of a bridge crossing between Delaware and New Jersey faced strong opposition from the Philadelphia Port Authorities, which claimed that the bridge would be a menace to navigation. They also are AT-CTI certified. Suicide by jumping from a bridge. But ferries carry limited numbers of cars and people, and in 1940 Delaware's General Assembly proposed studying the feasibility of building a bridge or tunnel. Stitcher The total replacement program cost for both bridges is estimated at approximately $50 million. Its a story that drives tour guides and historians of engineering crazy. But the costs for preparing a new location proved prohibitive, especially when the existing span meant that surrounding road infrastructure was already in place. Officials have announced details of the upcoming $71 million construction project overhauling parts of the Delaware Memorial Bridge. Symfuhny Warzone Keybinds, The project will remove the top 2 inches of the northbound (New Jersey-bound) side of the bridge deck and replace it with an "ultra high-performance concrete," according to the Delaware River and Bay Authority. These story elements include: the integrity of the concrete pour cant be compromised; and as tragic as the death of the worker is, modern industrial-age projects must go on unimpeded. Its like a teacher waved a magic wand and did the work for me. A firm known as HNTB (Howard, Needles Tammen & Bergendoff) designed the bridge.